149 research outputs found

    Benchmarking Biological Nutrient Removal in Wastewater Treatment Plants:Influence of Mathematical Model Assumptions

    Get PDF
    This paper examines the effect of different model assumptions when describing biological nutrient removal (BNR) by the activated sludge models (ASM) 1, 2d & 3. The performance of a nitrogen removal (WWTP1) and a combined nitrogen and phosphorus removal (WWTP2) benchmark wastewater treatment plant was compared for a series of model assumptions. Three different model approaches describing BNR are considered. In the reference case, the original model implementations are used to simulate WWTP1 (ASM1 & 3) and WWTP2 (ASM2d). The second set of models includes a reactive settler, which extends the description of the non-reactive TSS sedimentation and transport in the reference case with the full set of ASM processes. Finally, the third set of models is based on including electron acceptor dependency of biomass decay rates for ASM1 (WWTP1) and ASM2d (WWTP2). The results show that incorporation of a reactive settler: (1) increases the hydrolysis of particulates; (2) increases the overall plant's denitrification efficiency by reducing the S(NOx) concentration at the bottom of the clarifier; (3) increases the oxidation of COD compounds; (4) increases X(OHO) and X(ANO) decay; and, finally, (5) increases the growth of X(PAO) and formation of X(PHA,Stor) for ASM2d, which has a major impact on the whole P removal system. Introduction of electron acceptor dependent decay leads to a substantial increase of the concentration of X(ANO), X(OHO) and X(PAO) in the bottom of the clarifier. The paper ends with a critical discussion of the influence of the different model assumptions, and emphasizes the need for a model user to understand the significant differences in simulation results that are obtained when applying different combinations of 'standard' models

    Validation of a plant-wide phosphorus modelling approach with minerals precipitation in a full-scale WWTP

    Get PDF
    The focus of modelling in wastewater treatment is shifting from single unit to plant-wide scale. Plant-wide modelling approaches provide opportunities to study the dynamics and interactions of different transformations in water and sludge streams. Towards developing more general and robust simulation tools applicable to a broad range of wastewater engineering problems, this paper evaluates a plant-wide model built with sub-models from the Benchmark Simulation Model No. 2-P (BSM2-P) with an improved/expanded physico-chemical framework (PCF). The PCF includes a simple and validated equilibrium approach describing ion speciation and ion pairing with kinetic multiple minerals precipitation. Model performance is evaluated against data sets from a full-scale wastewater treatment plant, assessing capability to describe water and sludge lines across the treatment process under steady-state operation. With default rate kinetic and stoichiometric parameters, a good general agreement is observed between the full-scale datasets and the simulated results under steady-state conditions. Simulation results show differences between measured and modelled phosphorus as little as 4-15% (relative) throughout the entire plant. Dynamic influent profiles were generated using a calibrated influent generator and were used to study the effect of long-term influent dynamics on plant performance. Model-based analysis shows that minerals precipitation strongly influences composition in the anaerobic digesters, but also impacts on nutrient loading across the entire plant. A forecasted implementation of nutrient recovery by struvite crystallization (model scenario only), reduced the phosphorus content in the treatment plant influent (via centrate recycling) considerably and thus decreased phosphorus in the treated outflow by up to 43%. Overall, the evaluated plant-wide model is able to jointly describe the physico-chemical and biological processes, and is advocated for future use as a tool for design, performance evaluation and optimization of whole wastewater treatment plants

    Catchment & sewer network simulation model to benchmark control strategies within urban wastewater systems

    Get PDF
    This paper aims at developing a benchmark simulation model to evaluate control strategies for the urban catchment and sewer network. Various modules describing wastewater generation in the catchment, its subsequent transport and storage in the sewer system are presented. Global/local overflow based evaluation criteria describing the cumulative and acute effects are presented. Simulation results show that the proposed set of models is capable of generating daily, weekly and seasonal variations as well as describing the effect of rain events on wastewater characteristics. Two sets of case studies explaining possible applications of the proposed model for evaluation of: 1) Control strategies; and, 2) System modifications, are provided. The proposed framework is specifically designed to allow for easy development and comparison of multiple control possibilities and integration with existing/standard wastewater treatment models (Activated Sludge Models) to finally promote integrated assessment of urban wastewater systems

    Perspectives on Resource Recovery from Bio-Based Production Processes: From Concept to Implementation

    Get PDF
    Recovering valuable compounds from waste streams of bio-based production processes is in line with the circular economy paradigm, and is achievable by implementing “simple-to-use” and well-established process separation technologies. Such solutions are acceptable from industrial, economic and environmental points of view, implying relatively easy future implementation on pilot- and full-scale levels in the bio-based industry. Reviewing such technologies is therefore the focus here. Considerations about technology readiness level (TRL) and Net Present Value (NPV) are included in the review, since TRL and NPV contribute significantly to the techno-economic evaluation of future and promising process solutions. Based on the present review, a qualitative guideline for resource recovery from bio-based production processes is proposed. Finally, future approaches and perspectives toward identification and implementation of suitable resource recovery units for bio-based production processes are discussed

    Towards a plant-wide Benchmark Simulation Model with simultaneous nitrogen and phosphorus removal wastewater treatment processes.

    Get PDF
    It is more than 10 years since the publication of the Benchmark Simulation Model No 1 (BSM1) manual (Copp, 2002). The main objective of BSM1 was creating a platform for benchmarking carbon and nitrogen removal strategies in activated sludge systems. The initial platform evolved into BSM1_LT and BSM2, which allowed the evaluation of monitoring and plant-wide control strategies, respectively. The fact that the BSM platforms have resulted in 300+ publications demonstrates the interest for the tool within the scientific community. In this paper, an extension of the BSM2 is proposed. This extension aims at facilitating simultaneous carbon, nitrogen and phosphorus (P) removal process development and performance evaluation at a plant-wide level. The main motivation of the work is that numerous wastewater treatment plants (WWTPs) pursue biological phosphorus removal as an alternative to chemical P removal based on precipitation using metal salts, such as Fe or Al. This paper identifies and discusses important issues that need to be addressed to upgrade the BSM2 to BSM2-P, for example: 1) new influent wastewater characteristics; 2) new (bio) chemical processes to account for; 3) modifications of the original BSM2 physical plant layout; 4) new/upgraded generic mathematical models; 5) model integration; 6) new control handles/sensors; and 7) new extended evaluation criteria. The paper covers and analyzes all these aspects in detail, identifying the main bottlenecks that need to be addressed and finally discusses the aspects where scientific consensus is required

    A plant-wide model describing GHG emissions and nutrient recovery options for water resource recovery facilities

    Get PDF
    Acord transformatiu CRUE-CSICAltres ajuts: Borja Solís is grateful for the PIF PhD grant funded by Universitat Autònoma de Barcelona.In this study, a plant-wide model describing the fate of C, N and P compounds, upgraded to account for (on-site/off-site) greenhouse gas (GHG) emissions, was implemented within the International Water Association (IWA) Benchmarking Simulation Model No. 2 (BSM2) framework. The proposed approach includes the main biological N2O production pathways and mechanistically describes CO2 (biogenic/non-biogenic) emissions in the activated sludge reactors as well as the biogas production (CO2/CH4) from the anaerobic digester. Indirect GHG emissions for power generation, chemical usage, effluent disposal and sludge storage and reuse are also included using static factors for CO2, CH4 and N2O. Global and individual mass balances were quantified to investigate the fluxes of the different components. Novel strategies, such as the combination of different cascade controllers in the biological reactors and struvite precipitation in the sludge line, were proposed in order to obtain high plant performance as well as nutrient recovery and mitigation of the GHG emissions in a plant-wide context. The implemented control strategies led to an overall more sustainable and efficient plant performance in terms of better effluent quality, reduced operational cost and lower GHG emissions. The lowest N2O and overall GHG emissions were achieved when ammonium and soluble nitrous oxide in the aerobic reactors were controlled and struvite was recovered in the reject water stream, achieving a reduction of 27% for N2O and 9% for total GHG, compared to the open loop configuration
    • …
    corecore